Bid List
-
WSU Biological Science Building Fire Protection and Fire Alarm Installations
DUE DATE: 8/13/2026 10:00am Project Manual: Drawings: Prevailing Wage Rate Document #1: Prevailing Wage Rate Document #2:
-
St. Clair Trail Hub Restroom Building
DUE DATE: 7/27/2026 5:00pm Project Manual: Drawings: Drawing E-101 Revised: Addendum #1: Addendum #2:
-
Dearborn Public Schools-Salina Intermediate School Recreation Field
DUE DATE: 8/3/2026 10:00am Project Manual/Specifications: Drawings-Full Set: Drawings-Set #2: Milestone Schedule: Addendum #2: Addendum #3: Addendum #4:
-
DDC M1 Metallurgical Lab Renovation
DUE DATE: 6/1/26 5:00pm Project Manual: Scope of Work: Drawings: Asbestos Report: Bid Form: Scope of Work Letter-Revised: RFI Log #1: Bid Form-Revision 1: Addendum #1 Write Up: Pre-Bid Addendum Drawings: Addendum #1 Office Wall-SK01: Addendum #1 Automatic Entrances Spec: Addendum #1 Door Hardware Spec: Addendum #1 Laboratory Fume Hoods Spec: Addendum #1 Metal Laboratory…

Leave a Reply
You must be logged in to post a comment.