Construction of New Warren Library

April 15th, 2025 | Posted by Brencal in Uncategorized

DUE DATE: 5/6/2025 5:00pm

Project Manual and Specifications:

Drawings:

Labor Harmony Ordinance:

Prevailing Wage Requirements:

Bond Requirements:

Pre-Bid Sign in Sheet:

Addendum #1 Write Up:

Addendum #1 Bid Form and Specifications:

Addendum #1 Geotech Report:

Addendum #1 Temporary Facilities and Controls:

Addendum #1 Administrative Requirements:

Addendum #2:

Addendum #3:

Addendum #4:

Addendum #5:

You can follow any responses to this entry through the RSS 2.0 Both comments and pings are currently closed.