Oakland University Rec Center Pool Renovation

August 17th, 2026 | Posted by Brencal in Uncategorized - (Comments Off on Oakland University Rec Center Pool Renovation)

DUE DATE: 9/11/2026 5:00pm

Project Manual:

Drawings:

Specifications:

Wage Rate:

Addendum #1:

Addendum #2 RFP:

Addendum #2:

Addendum #3:

Addendum #3:

Addendum #4:

Addendum #5:

DDC Substation M1C Replacement

August 10th, 2026 | Posted by Brencal in Uncategorized - (Comments Off on DDC Substation M1C Replacement)

DUE DATE: 8/26/2026 5:00pm

Drawings:

Specifications:

Scope of Work:

M1C Submittal Package:

DDC M1 Metallurgical Lab Renovation

May 1st, 2026 | Posted by Brencal in Uncategorized - (Comments Off on DDC M1 Metallurgical Lab Renovation)

DUE DATE: 6/1/26 5:00pm

Project Manual:

Scope of Work:

Drawings:

Asbestos Report:

Bid Form:

Scope of Work Letter-Revised:

RFI Log #1:

Bid Form-Revision 1:

Addendum #1 Write Up:

Pre-Bid Addendum Drawings:

Addendum #1 Office Wall-SK01:

Addendum #1 Automatic Entrances Spec:

Addendum #1 Door Hardware Spec:

Addendum #1 Laboratory Fume Hoods Spec:

Addendum #1 Metal Laboratory Casework:

Addendum #2 Write Up:

Addendum #2 Drawings:

RFI Log #2: