Author Archives: Brencal

DDC M5 2nd Floor Bathroom Renovation

April 24th, 2025 | Posted by Brencal in Uncategorized - (Comments Off on DDC M5 2nd Floor Bathroom Renovation)

Due Date: 5/13/2025 5:00pm

Drawings:

Gilcher-Crissman Park Pavilion

April 22nd, 2025 | Posted by Brencal in Uncategorized - (Comments Off on Gilcher-Crissman Park Pavilion)

DUE DATE: 5/5/2025 10:00am

Project Manual/Specifications:

Drawings:

Schedule:

Bid Form:

Addendum #1 Write Up:

Addendum #1 Drawings:

Construction of New Warren Library

April 15th, 2025 | Posted by Brencal in Uncategorized - (Comments Off on Construction of New Warren Library)

DUE DATE: 5/6/2025 5:00pm

Project Manual and Specifications:

Drawings:

Labor Harmony Ordinance:

Prevailing Wage Requirements:

Bond Requirements:

Pre-Bid Sign in Sheet:

Addendum #1 Write Up:

Addendum #1 Bid Form and Specifications:

Addendum #1 Geotech Report:

Addendum #1 Temporary Facilities and Controls:

Addendum #1 Administrative Requirements:

Addendum #2:

Addendum #3:

Addendum #4:

Addendum #5:

test job posting

March 22nd, 2023 | Posted by Brencal in Jobs - (Comments Off on test job posting)

Sample Job Description

  1. Responsibility 1
  2. Responsibility 2
  3. Responsibility 3
  4. Responsibility 4
  5. Responsibility 5