DUE DATE: 6/1/26 5:00pm
Project Manual:
Scope of Work:
Drawings:
Asbestos Report:
Bid Form:
Scope of Work Letter-Revised:
RFI Log #1:
Bid Form-Revision 1:
Addendum #1 Write Up:
Pre-Bid Addendum Drawings:
Addendum #1 Office Wall-SK01:
Addendum #1 Automatic Entrances Spec:
Addendum #1 Door Hardware Spec:
Addendum #1 Laboratory Fume Hoods Spec:
Addendum #1 Metal Laboratory Casework:
Addendum #2 Write Up:
Addendum #2 Drawings:
RFI Log #2:
