Sub-contractor Walk Through: 5/19/2025 10:00am
Bid Due Date: 6/4/2025 10:00am
Project Manual:
Drawings:
Additional Drawings:
Addendum #1 RFI Responses/Write Up:
Addendum #1 DE4-00-01 Drawing:
Addendum #1 DE1-01-02 Drawing:
Addendum #1 Drawing 271109506:
Addendum #1 Donaldson Torit Installation and Operation Manual:
Addendum #1 Teflon Gasket:
Addendum #1 Drawings241709-01:
Addendum #1 Drawings 241709-2: