DDC ENGINE TEST CELL EXHAUST PARTICULATE REDUCTION

May 15th, 2025 | Posted by Brencal in Uncategorized

Sub-contractor Walk Through: 5/19/2025 10:00am

Bid Due Date: 6/4/2025 10:00am

Project Manual:

Drawings:

Additional Drawings:

Addendum #1 RFI Responses/Write Up:

Addendum #1 DE4-00-01 Drawing:

Addendum #1 DE1-01-02 Drawing:

Addendum #1 Drawing 271109506:

Addendum #1 Donaldson Torit Installation and Operation Manual:

Addendum #1 Teflon Gasket:

Addendum #1 Drawings241709-01:

Addendum #1 Drawings 241709-2:

You can follow any responses to this entry through the RSS 2.0 Both comments and pings are currently closed.